All integrations On the roadmap
WMS & Inventory
Korber (HighJump) + Ignite Lean
Korber One / HighJump runs large warehouses. Native connector planned for enterprise rollouts.
REST API roadmap
How the Connection Works
Korber (HighJump)
REST API
Ignite Lean
Into Ignite Lean
- Inventory data
- SKU master
Back to Korber (HighJump)
- Consumption
- Finished-goods receipts
How It Works
- 1A native Korber connector is on the roadmap.
- 2Custom API integration is available in the meantime.
- 3Request early access to move it up the list.
Recommended Workflows
How Korber (HighJump) works best with Ignite Lean. These are recommended patterns: Ignite Lean fires the trigger, and how Korber (HighJump) routes it (which work group, which device, which rule) is configured to your IT setup.
Andon part-call to replenishment
Trigger An operator pulls the andon "call for parts" at a station
- 1Ignite Lean fires a part-shortage event with the part number, quantity short, and the station that needs it.
- 2The connector creates a replenishment task in Korber (HighJump), assigned to your material-handling / put-away work group.
- 3A forklift or tow-train driver picks it up on their RF gun or tablet, pulls from the rack, and delivers to the line.
- 4When the driver confirms the drop, Korber (HighJump) reports the move and Ignite Lean clears the andon.
The line never sits idle waiting on parts, and every call is tracked end to end.
Build consumption keeps stock honest
Trigger A build consumes its components at the station
- 1Ignite Lean reports the material issue to Korber (HighJump) in real time.
- 2Korber (HighJump) decrements on-hand for each component used.
- 3If a part drops below its reorder point, Korber (HighJump) raises a purchase or transfer order.
Inventory stays accurate without double-keying, and reorders fire before you run out.
Finished goods to putaway
Trigger A build completes and passes final inspection
- 1Ignite Lean posts the finished-goods quantity and serials to Korber (HighJump).
- 2Korber (HighJump) directs putaway to the right location.
- 3The finished good is available to promise the moment it is on the shelf.
No gap between "built" and "sellable".
Want the Korber (HighJump) connector?
This one is on the roadmap. Tell us you want it and we'll move it up the list and email you when early access opens.