All integrations On the roadmap
SCADA / MES & Machine Data
Yokogawa CENTUM VP + Ignite Lean
Yokogawa CENTUM VP runs process plants. Tap its historian for batch and OEE data.
OPC-UA roadmap REST API roadmap
How the Connection Works
Machine / PLCcycle, state, faults
Yokogawa CENTUM VPSCADA / edge
OPC-UA
Ignite Leaningest + map tags
Downtime on the floor map
Live OEE + cycle time
Auto work orders
How It Works
- 1CENTUM exposes data via OPC-UA.
- 2Ignite Lean ingestion is on the roadmap.
- 3Request early access.
Recommended Workflows
How Yokogawa CENTUM VP works best with Ignite Lean. These are recommended patterns: Ignite Lean fires the trigger, and how Yokogawa CENTUM VP routes it (which work group, which device, which rule) is configured to your IT setup.
Machine down to work order
Trigger A machine reports a stop or fault
- 1Yokogawa CENTUM VP publishes the downtime or fault over MQTT or OPC-UA.
- 2Ignite Lean opens a downtime event on the floor map immediately.
- 3If it runs past your threshold, an auto work order goes to maintenance.
- 4The OEE clock reflects the loss live.
Downtime is caught and dispatched the second it happens, not at shift change.
Sensed OEE, not typed
Trigger Each machine cycle completes
- 1Yokogawa CENTUM VP streams the cycle count to Ignite Lean.
- 2Ignite Lean attributes it to the station and the active order.
- 3OEE, cycle time, and throughput update on their own.
OEE you can trust because it is measured, not hand-entered.
Want the Yokogawa CENTUM VP connector?
This one is on the roadmap. Tell us you want it and we'll move it up the list and email you when early access opens.